B. leveling – HTP 399M User Manual

Page 14

Advertising
background image

14

Table 1

– Specifications

Before considering location, many factors need to be addressed. Piping, Venting, and Condensation Removal are just a few of the
issues that need attention prior to the installation of the boiler. Please read the entire manual, as it could save time and money.

B. LEVELING

Figure 3

– Boiler Leveling

In order for the condensate to properly flow out of the collection system, the boiler must be installed

with 1/8” per foot pitch toward the

back. The location must also support the boiler when it is full of water. The boiler comes equipped with leveling feet. Should the floor
beneath the boiler be uneven, use a wrench to adjust the feet so the boiler is pitched back at 1/8” per foot.










Advertising
This manual is related to the following products: