Vanguard ATRT-01_01B S3 User Manual
Page 35

REV 1 ATRT-01/01B S3 USER’S MANUAL
31
Make the cable connections per the instructions and then press the
[START]
key to
run the Phase A test.
g. The following screen will be displayed while the test is being performed:
The Phase A test results will be displayed on the LCD screen when testing has finished:
Press the
[ENTER]
key to continue.
h. The following screen will be displayed showing the Phase B cable connections for the
selected test:
Make the cable connections per the instructions and then press the
[START]
key to
run the Phase B test.
i. The following screen will be displayed while the test is being performed:
The Phase A and B test results will be displayed on the LCD screen when testing has
finished:
TESTING:
DYN1 phase B
PHASE B
CABLE XFMR
X1,X2 to x2,x0
h1,h2 to h2,h1
"START" when READY
RATIO MA
%DIFF
+15.003 001 0.02
"ENTER" TO CONTINUE..
TESTING:
DYN1 phase a