Vanguard CT-8000 S3 User Manual

Page 115

Advertising
background image

REV 1 CT-8000 S3 USER’S MANUAL

110

3.5.5. Printing a Breaker Test Plan Stored in a USB Flash Drive

Follow the steps below to print a breaker test plan stored in a USB Flash drive:

a. Make sure a USB Flash drive is connected to the unit's USB Flash drive port ("USB MEM"

port), and then start from the "START-UP" menu:

Press the

[4]

key (SETUP).

b. The following screen will be displayed:

Press the

[1]

key (ANALYSIS POINTS).

c. The following screen will be displayed:

Press the

[4]

key (TEST PLANS).

d. The following screen will be displayed:

Press the

[2]

key (PRINT TEST PLAN).

1.

LOAD TEST PLAN

2.

PRINT TEST PLAN

3.

PRINT PLAN DIR

4.

ERASE TEST PLAN

5.

SAVE TEST PLAN

1.

OPEN TIMING

2.

CLOSE TIMING

3.

PRINT SETTINGS

4.

TEST PLANS

1.

ANALYSIS POINTS

2.

MEASUREMENT UNITS

3.

SHOT DESCRIPTION

4.

NUMBER OF CHANNELS

5.

NEXT PAGE

1.

RUN TEST 10/09/13

2.

GET RESULTS 15:30:20

3.

SAVE/RESTORE

4.

SETUP

5.

DIAGNOSTICS