3 controls and installation, 1 electrical installation, 1 pin assignment of the connector – LumaSense Technologies IS 6 Advanced User Manual

Page 15

Advertising
background image

IS 6 Advanced / IGA 6 Advanced Manual

Controls and Installation · 15

3 Controls and Installation

3.1 Electrical Installation

The IS 6 Advanced / IGA 6 Advanced is powered by a voltage of 24 V DC ± 25% (ripple < 50 mV).
It is important to ensure correct polarity when connecting the device to the power supply.
To meet the electromagnetic requirements (EMV), a shielded connecting cable must be used.
LumaSense offers connecting cables, which are not part of the standard scope of delivery. The
shield of the connecting cable has to be connected only on the pyrometer’s side. If the
connecting cable is extended, the shield of the extension also needs to be extended. The shield
must be open on the power supply side (switch board), to avoid ground loops.
The connecting cable has wires for the power supply, interface, analog output, switch contact,
and external clearing of the maximum value storage via contact and 12-pin connector (see
Chapter

8

, Reference numbers).

Attention: When connecting the power supply, ensure the polarity is correct.

Once the instrument has been connected to the power supply, it is immediately ready for use.
Although it does not need to be warmed up, it does need to run for approximately 15 to 30
minutes before achieving full accuracy. The instrument can be switched off by interrupting the
power supply or unplugging the electrical connector.

3.1.1 Pin assignment of the connector

12-pin connector

Pin assignment

(view of the connector pins)

Advertising
This manual is related to the following products: