PAGE 6

5.5 CONDITIONING THE DESICCANT BED

To condition the desiccant bed, the dryer system is operated without any

outlet flow while the towers regenerate with purge air.

Observe the dryer system for several cycles to make sure that it is

operating properly.

At initial start up or after extended shutdowns (over one month), the

dryer system may take 24 to 48 hours of continuous operation for the

bed to be conditioned. Moisture that has accumulated on the desiccant

bed should be removed before the dryer system is placed on stream.

Once the moisture indicator on the dryer system turns blue, the desiccant

bed is ready. The Prep-40 dryer is now ready for operation.

START UP

SECTION 5

5.1 START UP

WARNING

BEFORE STARTING THIS DRYER SYSTEM, FOLLOW THE

INSTALLATION INSTRUCTIONS AND PROCEDURES COMPLETELY.

SERIOUS PERSONAL INJURY CAN RESULT IF INSTRUCTIONS ARE

NOT CAREFULLY AND COMPLETELY FOLLOWED.

DO NOT REMOVE, REPAIR, OR REPLACE ANY ITEM ON THIS

DRYER SYSTEM WHILE IT IS PRESSURIZED.

Make sure that the Power switch is in the

OFF position.

If the dryer system is being started up for the first time or after the

desiccant has been changed, the purge mufflers must be removed.

See

SECTION 2.2 for safety precautions concerning the desiccant

dust.

WARNING

WHEN OPERATING THIS DRYER SYSTEM WITHOUT THE

MUFFLERS INSTALLED, USE HEARING PROTECTION.

Pressurize the air system.

Place the Power switch in the

ON position. One tower will already be

pressurized. The other tower will depressurize. The purge valve on

the tower that is not pressurized will be open, air should be exhausting

from the muffler.

The dryer system is equipped with a purge metering valve. The setting

should be checked per

SECTION 5.2 before placing the dryer system

on stream.

Set the control pressure regulator per

SECTION 5.3.

Set the lubricator and regulator for the pre-cooler air motor per

SECTION 5.4.

Condition the desiccant bed per

SECTION 5.5 before placing the dryer

system on-stream.

Install the purge mufflers per

SECTION 5.6.

5.2 ADJUSTING THE PURGE FLOW

IMPORTANT

NEVER OPERATE THE DRYER SYSTEM WITH THE PURGE

METERING VALVE CLOSED. IF THE VALVE IS CLOSED, THE

TOWERS WILL NOT REPRESSURIZE AND SWITCHING FAILURE

WILL OCCUR.

DO NOT ADJUST THE PURGE METERING VALVE ABOVE OR BELOW

THE RECOMMENDED SETTING FOR THE OPERATING CONDITIONS

OF THIS INSTALLATION. IMPROPER SETTING MAY CAUSE POOR

DRYER SYSTEM PERFORMANCE AND/OR

EXCESSIVE USE OF PROCESS AIR.

FIGURE 5B REQUIRED PURGE FLOW

DRYER

MODEL

FR-400

PURGE

FLOW

72.0 SCFM

5.3 SETTING THE CONTROL PRESSURE REGULATOR

The control pressure regulator is located in line with the control filter and

it is used to protect the pneumatic control components. This regulator

should be set at 115 PSIG.

CAUTION

DO NOT OPERATE THIS DRYER SYSTEM WITH

THE CONTROL AIR PRESSURE REGULATOR

ABOVE 115 PSIG TO PREVENT DAMAGE TO

THE PNEUMATIC CONTROLS.

5.4 ADJUST THE REGULATOR & LUBRICATOR

The regulator and lubricator for the pre-cooler air motor must be properly

set to ensure trouble-free air motor operation.

The regulator is used to set the speed of the pre-cooler fan. The regulator

is factory set using a tachometer and a clean precooler core. See

FIGURE

5C. As the core becomes dirty, a higher regulator pressure setting may

be required to maintain the fan speed.

Set the lubricator per

FIGURE 5D.

FIGURE 5C FACTORY REGULATOR SETTING

DRYER

MODEL

FR-400

SETTING

(PSIG)

22

FIGURE 5D LUBRICATOR SETTING

DRYER

MODEL

FR-400

DROPS PER

MINUTE

1

FAN SPEED

(RPM)

1725

AIR USAGE

(SCFM)

15

The Prep-40 dryer system is equipped with a purge metering valve and

gauge. Reference

SECTION 3.2 for Location. The gauge indicates the

back pressure on the purge flow orifice, which is in direct correlation to

the purge flow in SCFM.

The purge flow can be adjusted for the operating conditions.

This dryer system was shipped with the purge flow set for the rated inlet

flow at 100 PSIG. Reference

SECTION 3.1 for rated flow. This setting

should be correct for most installations. Before placing the dryer system

on stream, check the purge metering valve setting.

FIGURE 5B shows the purge flow, in SCFM, and the pressure setting

required for each model. This flow is required to properly regenerate

the desiccant beds.

PURGE FLOW

GAUGE SETTING

39 PSIG