NSi Industries DGM100A User Manual

Page 7

Advertising
background image

5

You are able to select up to 9 holiday blocks, which

will exclude all of the regular schedules, and execute a

special set that will only run on those specified days . If

no holiday schedule is entered in step 6, operations

will be omitted during the block . Holiday blocks can be

anywhere from 1 day in length (the same start and end

dates) or up to 364 days . Holiday blocks cannot

end after they begin . If a holiday block must run from

December 18th through January 5th, you have to

program one block from 12/18 to 12/31, and then

another from 01/01 to 01/05 .
To skip, press the MODE key .

5.1 TO SET HOLIDAY DATES
Press the ENTER key .

Press the MONTH, and DATE keys to set the date to

the desired start date (H1 ON) .
Press the ENTER key .

For a single day holiday, press the ENTER key (OR)
Press the MONTH, and DATE keys to set the date to

the desired end date (H1 OFF)

Advertising
This manual is related to the following products: