NSi Industries DG280A-24 User Manual

Page 3

Advertising
background image

1

TORK MODEL

DG180A/DG280A/DG280A-24

7 DAY DIGITAL TIME SWITCH

READ INSTRUCTIONS CAREFULLY BEFORE

ATTEMPTING TO INSTALL TIME SWITCH. SEE

WARNING ON FRONT PANEL – Failure to comply with

instructions could result in personal injury and/or property

damage .

INSTALLATION:

UNIT IS TO BE INSTALLED BY A LICENSED ELECTRICIAN

1 . Remove unit from enclosure by pushing the inside

tab (located near the outside hasp) to the right .

Swing unit to left and remove .

2 . Mount the enclosure at eye level using screws

or other suitable fastening device . Bring supply

and load wires in through or side knockouts .

DO NOT USE TOP .

3 . Reinstall unit by reversing step #1 above and

connecting wires to units as per suggested

wiring diagrams at back of manual .

4 . Unit should be programmed with AC power . Do

not program under super cap back up power .

AT POWER UP;

Connect unit to main power source prior to entering the

settings . When powering up the unit for the first time,

allow 1-2 minutes for super cap to charge and the

display will show 12 HOUR . Press reset button after 2

minutes if screen is blank .

CAPABILITIES

- 24 hour scheduling

- 56 set points

- 2 Duty cycle or signal durations (maximum 24 hours)

- Unique “Skip Day” cycle pattern (repeats for up to 31

day cycles)

Advertising
This manual is related to the following products: