Battery backup replacement, Tools and materials, Btttery btckup repltcement – Badger Meter ORION AMR/AMI Hardware Solutions for Gas Utilities User Manual

Page 32

Advertising
background image

ORION® Fixed Network (SE) II Network Gateway Transceiver

BTTTERY BTCKUP REPLTCEMENT

If a battery replacement is required, complete the installation steps as detailed below in the order presented .

NOTE:

N

It is not necessary to disconnect AC power from the gateway before removing the cover and replacing the battery .

Tools and Materials

Rechargeable battery pack kit with enclosure cover (67018-001)

#2 slotted or Phillips screwdriver (customer-supplied)

MPORTTNT

I

Working with electronics requires the use of proper electrostatic discharge (ESD) protection. Grounded wrist straps are

recommended when working inside the enclosure.

1 . Using a #2 slotted or Phillips screwdriver, remove the enclosure cover by unscrewing four corner-cover screws

(Figure 42) . The cover will not be used again and can be discarded .

Remove Four Corner Screws

Cover Removed

Figure 42: Enclosure cover removal

2 . Squeeze the connector latch (Figure 43) of the battery connector on the circuit board and carefully pull on the

connector to remove it from the circuit board pin contacts . Do NOT pull on the connector wires . If the connector is

stuck, it can need to be gently rocked back and forth while pulling .

Figure 43: Battery connector

NOTE:

N

The battery is held in place by the enclosure cover only . No other adhesive or locking mechanism is used .

Battery Connector

Latch

Page 32

March 2014

Advertising
This manual is related to the following products: