Including a Schedule

ReadCenter Analytics

Gateway Reading> Gateway Setup

ReadCenter Analytics Mobile

n/a

Once schedules have been defined, they can be associated with gateways One schedule can be associated with

multiple gateways

1 On the Gateway Setup screen, select the gateway Click the row to select it
2 Click the Include Schedule button at the bottom right of the screen

Result: The Include Schedule window opens, showing the schedules that were defined. Refer to

"Defining Gateway

Schedules" on page 78

for additional information.

3 From the list of schedules, click the row to select the schedule that should be assigned to the gateway
4 Click the Select button

Result: The schedule is included under the Schedules tab for the gateway.

5 Repeat steps 1…4 to assign the desired schedules to a gateway When complete, the screen should look similar to

the example shown here

6 Click Close to exit the Gateway Setup screen