Figure 2, Figure 3 – Badger Meter Cox Precision Turbine Meters User Manual

Page 8

Advertising
background image

Procedure for Cleaning a Turbine Meter after Water Calibration and/or Service

OTEE:

N

When cleaning flow meters, keep the body, sleeve and pickoff together . Sleeve is fitted to body and pickoff has a

protruding pin . Replacement pickoffs are supplied with a nut and have no protruding pin .

1 . Remove the meter from the line and let all excess water drip out .
2 . Fill the meter with alcohol (at least 50% Isopropyl, Ethyl or Methyl) and let it stand for 5 minutes .
3 . Discard the alcohol and let the meter dry for 2 minutes .
4 . Fill the meter with MIL-C-7024 Type 2 calibration fluid (or similar solvent) and let it stand for 1 minute .
5 . Discard the calibration fluid and flush the meter with an approved fluorocarbon solvent, such as Isotron .

OTEE:

N

If this procedure is not possible, the turbine meter should always remain filled with water when not in use, to prevent

internal wetted parts from being exposed to air .

CLFC6, CLFD6, CLFE6

CLFB6, CLFA6

CLFF6

CLFC6, CLFD6, CLFE6, CLFF6
1 . Body *

2 . C-washer

3 . Hub *

4 . Spring *

5 . Spacer

6 . Bearing retainer ring *

7 . Bearing

8 . Rotor *

9 . Straightener assembly *

10 . Body retaining ring

CLFB6, CLFA6
1 . Body *

2 . C-washer

3 . Hub *

4 . Spring *

5 . Spacer

8 . Rotor *

9 . Straightener assembly *

10 . Body retaining ring

* Replaceable at factory level only .

OTEE:

N

Order parts by name and basic number shown, followed by flow meter

size designation . For example, order a bearing for a CLFF6 flow meter

as bearing #1400-63 . Flow meter serial number must be provided when

ordering parts .

Figure 2: Cox Precision LoFlo turbine flow meter

Figure 3: Cox precision turbine flow meter

DO NOT INTERCHANGE FLOW METER PARTS OTHER THAN BEARINGS AND RETAINING RINGS. THIS PRECAUTION IS

NECESSARY TO PRESERVE LINEARITY AND REPEATABILITY.

Precision Meters, Turbine Flow Meters

Page 8

May 2014

Advertising