Control inputs – Badger Meter Water Conditioning User Manual

Page 9

Advertising
background image

Control Inputs

Start and Stop Inputs

G 1 2 3 4 5 6 7 8 9 10 G

Start

Stop

All switch loads

5VDC @ 1mA

16-28 AWG

terminal wiring

Dry Contact or NPN Lock

Use either a mechanical

switch, or an NPN transistor

connected between input 3

and either ground terminal.

G

1

2 3

4

5

6

7

8

9 10 G

115V AC Lock

95-130 VAC

Orange leads

White

Black

R

ed

To 12V on

Transmitter Input

Terminal Block

Badger

Meter

#####

G

1

2 3

4

5

6

7

8

9 10 G

User Manual

Page 9

April 2013

Advertising