Chapter 5: maintenance, 1 preventative maintenance schedule, Photocopy this page for your maintenance records – Sterlco GH-M Series Extrusion Control Weigh Hoppers User Manual

Page 42: Every week

Advertising
background image

Chapter 5: Maintenance

42 of 60

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

The mechanical design of the GH Hopper is very simple and very little maintenance is
required. The only moving parts are the metering gates, weigh hopper dump valve, and
mixer agitator. The checklist below contains a list of items which should be inspected and/or
replaced to keep your GH Hopper operating at peak efficiency. Perform each inspection at
the regular intervals listed below.

Figure 52: Sample Preventative Maintenance Schedule

System model #

Serial #

Daily

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Inspect hopper for
any loose parts-
tighten them
immediately.

Verify quality of
compressed air
supply.

Inspect weigh
hopper for
obstructions.

Every week

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Date/

By

Verify the rate
monitor is properly
calibrated.

Check to make
sure that all hose
connections are air
tight.

Every month

Jan Feb Mar Apr May

Jun

Jul

Aug

Sep Oct Nov

Dec

Inspect air regulator
and air safety
circuits, if equipped.

Recalibrate rate
monitor If necessary.

Photocopy this page for your maintenance records

Advertising
This manual is related to the following products: