Installation, Required tools, Site preparation – Avaya P332G-ML User Manual

Page 33: Chapter 4, Installation required tools site preparation

Advertising
background image

Avaya P332G-ML User’s Guide

17

Chapter 4

Installation

The P332G-ML is ready to work after you complete the installation instructions
below.

Required Tools

Make sure you have the following tool at hand before undertaking the Installation
procedures:
•

Phillips (cross-blade) screwdriver

Site Preparation

You can mount Avaya P330 switches alone or in a stack in a standard 19-inch
equipment rack in a wiring closet or equipment room. Up to 10 units can be stacked
in this way. When deciding where to position the unit, ensure that:
•

It is accessible and cables can be connected easily and according to the
configuration rule.

•

Cabling is away from sources of electrical noise such as radio transmitters,
broadcast amplifiers, power lines, and fluorescent lighting fixtures.

•

Water or moisture cannot enter the case of the unit.

•

There is a free flow of air around the unit and that the vents in the sides of the
case are not blocked.

L Use Octaplane cables to interconnect with other switches.
•

The environmental conditions match the requirements listed below:

Table 4.1

Environmental Prerequisites

Operating Temp.

-5 to 50°C (23 to 122°F)

Relative Humidity

5% to 95% non-condensing

Advertising