Chapter 3 installation, Inspecting the equipment, Connecting the ups internal battery – HP Tower Uninterruptible Power System User Manual

Page 11: Installation

Advertising
background image

HP T750 G2, HP T750J, HP T1000 G3, HP T1000J, HP T1500 G3, and HP T1500J UPS Models User Guide

S 505922-002

4

 Chapter 3

Installation

This section explains:

S

Equipment inspection

S

UPS internal battery connection

S

UPS installation

S

UPS rear panels

 Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping cartons and
packing materials for the carrier or place of purchase and file a claim for shipping
damage. If you discover damage after acceptance, file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with the carrier
within 15 days of receipt of the equipment; 2) Send a copy of the damage claim within
15 days to your service representative.

NOTE:

Check the battery recharge date on the shipping carton label. If the date has

passed and the batteries were never recharged, do not use the UPS. Contact your service
representative.

 Connecting the UPS Internal Battery

To ensure proper battery operation:

1

Verify that the UPS power is off and unplugged.

2

Pull the top left corner forward and remove the UPS front bezel (see Figure 2).

Figure 2

Removing the UPS Front Bezel

Advertising