Server bay status screen – HP Virtual Connect 4Gb Fibre Channel Module for c-Class BladeSystem User Manual

Page 257

Advertising
background image

Virtual Connect modules 257

Server Bay Status screen

To change the power state of the server, click Momentary Press.
If the server is powered on, click Press and Hold to force a shutdown.
The following table describes the rows within the Server Bay Status table in the Server Bay Status screen.
Server Bay Status

NOTE:

Servers connected through VC 8Gb 24-Port FC Modules can take between 15 and 25

seconds to recover from a module uplink port failure.

Advertising