P2v post-migration tasks – HP Insight Control User Manual

Page 76

Advertising
background image

13. To cancel the migration, click Cancel. After the entry in the Job Status field indicates you canceled

the migration, reboot the source and destination servers.

14. Click Begin New Migration to start an additional migration.

P2V post-migration tasks

After you complete a P2V migration, perform the following steps on the destination server:

1.

If you manually booted the virtual machine using the Insight Control server migration Virtual Machine
Boot CD, you must disconnect the Insight Control server migration Virtual Machine Boot CD and then
manually reboot or shut down the virtual machine.

2.

Add necessary network configurations to the migrated virtual machine guest. To do so, access the
destination virtual machine host remote console to configure the network connections for the migrated
virtual machine guest.

3.

(Optional) Add a CD-ROM component to the destination virtual machine. The CD-ROM might be required
to install additional Integrated Components.

After the virtual machine reboots, you must perform the following steps on the destination virtual machine
guest for hypervisors.

1.

Modify the system host name.

2.

Install the proper Guest tools.

3.

Check the network connections and re-establish network connectivity. If an IP address conflict occurs
when setting the static IP address, see

http://support.microsoft.com/kb/269155/

for more information.

4.

View the Windows event log on the destination server and disable any services or drivers that might
have failed.

76

Using Insight Control server migration to migrate servers

Advertising