Installation instructions, Remove filters, Remove wiring cover from the junction box – GE JVE40DTBB User Manual

Page 10: Remove wiring knockout, Remove duct knockout(s)

Advertising
background image

10

49-80622-4

REMOVE FILTERS

Remove the protective shipping film from the edges

of the metal grease filters . Press the filter locks back and

lift the filters out . Set them aside .

REMOVE WIRING COVER

FROM THE JUNCTION BOX

Remove the wiring cover from inside the hood .

Set the cover and its mounting screw aside .

Wiring

cover

Mounting

Screw

REMOVE WIRING KNOCKOUT

Remove either the top or the back wiring knockout as

needed and install an approved strain relief clamp .

Strain relief

clamp

2

3

4

5

Filters

Installation Instructions

REMOVE DUCT KNOCKOUT(S)

If recirculating, non-vented ductless see note below and

skip to Step 7 and proceed.

Using a flat blade screwdriver, remove the appropriate

duct knockout(s) from the top or back of the hood .

3

1

4

” x 10” Rectangular

vertical discharge.

Remove top rectangular

duct knockout only .

3

1

4

” x 10” Rectangular

horizontal discharge . Remove

rear rectangular duct

knockout only .

NOTE: If the hood is to be installed in a recirculating,

non-vented ductless manner, order charcoal filters, kit

number WB02X11000 for 30

hood models . These kits

can be ordered from your GE supplier . Skip to Step 7C and

proceed.

NOTE: If the hood in installed for recirculation mode, it is

not E

nergy

S

tar

®

certified .

Advertising
This manual is related to the following products: