Installation preparation, Caution – GE PV977NSS User Manual

Page 10

Advertising
background image

10

49-80550-2

Installation Preparation

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

Pliers

:LUHFXWWHUVWULSSHU

Metal snips

Spirit level

Aluminized

Duct tape

Safety glasses

120V 60Hz. 15 or 20 Amp,

2-wire with ground, properly

grounded branch circuit

Step ladder

Saber saw or Key Hole saw

Phillips screwdriver

Strain relief for

junction box

8” Round metal

duct, length to

suit installation

Hammer

(OHFWULFGULOOZLWKµ

bits, #2 Phillips head

Flashlight

UL listed wire nuts

Pencil and tape measure

REMOVE THE PACKAGING

CAUTION:

Wear gloves to protect

against sharp edges.
• Remove the duct covers.
• Remove the hardware bag, literature package

and other boxed parts.

• Remove and properly discard the protective

plastic wrapping and other packaging materials.

Advertising