Installation instructions, Warning – GE PV977NSS User Manual

Page 23

Advertising
background image

49-80550-2

23

Installation Instructions

STEP 7 DETERMINE DUCT LENGTH

AND INSTALL DUCT

• Measure from the hood exhaust opening to

the top of the supports as shown in the figure.

• Subtract the height of the air deflector.
• Cut the 8” duct to the appropriate length. Attach

to air deflector using aluminized tape and screws.

Length of duct

needed minus the

length protruding

through the ceiling.

STEP 8 INSTALL HOOD ASSEMBLY

TO CEILING SUPPORT

WARNING:

Two people are required

to lift and position the hood onto the support.
• Carefully lift the hood assembly to the ceiling

support. The clips on the ceiling support will snap

into the openings on the vertical supports.

• Slip the duct over the exhaust opening.
• Using the screws provided, attach the upper

vertical supports to the ceiling support, 2 screws

per side for a total of 16 screws.

• Seal the air duct to the exhaust opening using

aluminized duct tape.

Ceiling

support

Air

deflector

Clips

Tape with

aluminized

duct tape

Advertising