Installation preparation, Check installation hardware, Recirculating kit (included) – GE PV977NSS User Manual

Page 11: Air deflector

Advertising
background image

49-80550-2

11

CHECK INSTALLATION HARDWARE

Locate the hardware package packed with the hood and check contents.

RECIRCULATING KIT (Included)

Installation Preparation

Air deflector

36" HOOD
TEMPLATE

Cut one 1/2" Dia.
Wire Access Hole

as Needed

8-1/4" To

Centerline of

Pilot Holes

8-1/2"

FRONT OF HOOD

Cut one 1/2" Dia.
Wire Access Hole

as Needed

Cut one 1/2" Dia.
Wire Access Hole

as Needed

Cut one 1/2" Dia.
Wire Access Hole

as Needed

Drill 3/16" Pilot Holes

Approx. 1-1/2" Deep

4 Places

8-1/4" To

Centerline of

Pilot Holes

10-5/16" To

Centerline of

Pilot Holes

10-5/16" To

Centerline of

Pilot Holes

31-14772
Printed in Mexico 12-08 JR

4 Wood

screws

73 Hood attachment screws

(70 required, 3 extra)

Duct covers

Charcoal filter

C

Duct cover supports (2)

Template

Ceiling support

Horizontal support

Upper vertical supports (4)

Lower vertical supports (4)

4 Duct cover clips

Stainless steel filter

D

B

E

A

A

B

C

D

E

HARDWARE PACKAGE

Locate and count

screws

Upper

Lower

Advertising