Installation preparation, Determine installation height – GE PV977NSS User Manual

Page 12

Advertising
background image

12

49-80550-2

DETERMINE INSTALLATION HEIGHT

• Decorative duct covers are provided to conceal

the ductwork running to the ceiling.

• This hood can be installed for recirculating

operation. Recirculating Kit included with hood.

NOTE: Installation height should be measured from

the cooking surface to the flat portion of the bottom

of the hood.
For optimum performance, the hood must be

24” min. and 30” max. above the cooking surface.

The hood installation height depends upon ceiling

height.

Installation Preparation

*Based on 36” countertop height

24” Min.*

30” Max.*

36” Min.

* Exact installation

height depends

on ceiling height.

PV977 – Island

Upper Duct Cover

29.92

Lower

Duct

Cover

25.98

Counter to Hood Height

Actual

*Possible

Ceiling

*Possible

VENTED

RECIRCULATING

Height

Installation Height

Installation Height

7’11” 24”

24”

8’ 0”

24” to 25”

24” to 25”

8’ 1”

24” to 26”

24” to 26”

8’ 2”

24” to 27”

24” to 27”

8’3”

24” to 28”

24” to 28”

8’ 4”

24” to 29”

24” to 29”

8’ 5”

24” to 30”

24” to 30”

8’ 6”

24” to 30”

24” to 30”

8’ 7”

24” to 30”

24” to 30”

8’ 8”

24” to 30”

24” to 30”

8’ 9”

24” to 30”

24” to 30”

8’ 10”

24” to 30”

24” to 30”

8’ 11”

24” to 30”

24” to 30”

9’ 0”

24” to 30”

24” to 30”

9’ 1”

24” to 30”

24” to 30”

9’ 2”

24” to 30”

24” to 30”

9’ 3”

24” to 30”

24” to 30”

9’ 4”

24” to 30”

24” to 30”

9’ 5”

26” to 30”

24” to 30”

9’ 6”

26” to 30”

24” to 30”

9’ 7”

27” to 30”

24” to 30”

9’ 8”

28” to 30”

24” to 30”

9’ 9”

29” to 30”

24” to 30”

9’ 10”

30”

25” to 30”

9’ 11”

26” to 30”

10’ 0”

27” to 30”

10’ 1”

28” to 30”

10’ 2”

29” to 30”

10’

3”

30”

Advertising