Step 1 mount template, Step 2 install ceiling support, Screws front – GE PV977NSS User Manual

Page 16

Advertising
background image

16

49-80550-2

• Align the template with the marks on the ceiling

and tape in place.

– Be sure the template is oriented correctly

with the front of the hood.

• Use a plumb bob to be sure the mounting holes

will provide parallel alignment with the countertop

below.

• Determine wire access hole location.
• Center punch all screw and determined wire hole

locations.

‡'ULOOSLORWKROHVLQWKHVFUHZORFDWLRQV8VHDµ

ELWDQGGULOODSSUR[LPDWHO\µGHHS

‡'ULOORQHµKROHIRUZLUHV
‡&XWWKHµGXFWRSHQLQJWKURXJKWKHFHLOLQJ

STEP 1 MOUNT TEMPLATE

Installation Instructions

,167$//$7,21³9(17('727+(2876,'(

STEP 2 INSTALL CEILING SUPPORT

• Using 4 wood screws provided, attach the ceiling

support to the ceiling over duct opening hole

using pilot holes drilled in step 1.

STEP 3 INSTALL LOWER VERTICAL

AND HORIZONTAL SUPPORTS

TO HOOD ASSEMBLY

• Using screws provided, attach the 4 lower

vertical supports to the hood assembly with 4

screws per support.

• Using screws provided, install the horizontal

support in the top outer holes of the vertical

supports.

36" HOOD
TEMPLATE

Cut one 1/2" Dia.
Wire Access Hole

as Needed

8-1/4" To

Centerline of

Pilot Holes

8-1/2"

FRONT OF HOOD

Cut one 1/2" Dia.
Wire Access Hole

as Needed

Cut one 1/2" Dia.
Wire Access Hole

as Needed

Cut one 1/2" Dia.
Wire Access Hole

as Needed

Drill 3/16" Pilot Holes

Approx. 1-1/2" Deep

4 Places

8-1/4" To

Centerline of

Pilot Holes

10-5/16" To

Centerline of

Pilot Holes

10-5/16" To

Centerline of

Pilot Holes

31-14772
Printed in Mexico 12-08 JR

Screws

Front

Advertising