Installation instructions, Step 4 determine frame height – GE PV977NSS User Manual

Page 17

Advertising
background image

49-80550-2

17

Installation Instructions

STEP 5 INSTALL UPPER VERTICAL

SUPPORTS TO HOOD ASSEMBLY

• Determine how much of the upper vertical

supports will need to be above the lower supports

to accomplish the frame height determined in

step 4 for this installation.

• Using screws provided, attach the 4 upper vertical

supports to the lower vertical supports at the

position determined for frame height. The upper

vertical supports are mounted to the outside

of the lower supports.

STEP 4 DETERMINE FRAME HEIGHT

•Measure exact

ceiling height.

• Find the exact

frame height

required

on the chart

on page 12.

• Use this formula

to determine

your frame

height:

A-(B+C+D) =

Frame height E where

A is the ceiling height,

B is the countertop

height, C is the height

determined by the

chart on page 12, D

is the height of the

hood measured from

the straight bottom

portion to the top

at the center.

24” Min.*

30” Max.*

36” Min.

Frame

height

µ

Ceiling

height

E

E

A

B

D

C

*See Chart on page 12.

Advertising