Warning – GE PV977NSS User Manual

Page 24

Advertising
background image

24

49-80550-2

Installation Instructions

,167$//$7,21³5(&,5&8/$7,1*

STEP 9 CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING:

If house wiring is not 2-wire

with a ground wire, a ground must be provided by

the installer. When house wiring is aluminum, be

sure to use U.L. approved anti-oxidant compound

and aluminum-to-copper connectors.

• Remove the 6 screws on the junction box cover

and the knockout on the top left side.

• Secure the house wiring to the junction box with

a strain relief (not provided).

• Connect the white lead to the branch circuit white lead.
• Connect the black lead to the branch circuit black lead.
‡&RQQHFWWKHJUHHQ\HOORZOHDGWRWKHEUDQFK

circuit green lead or bare ground lead.

• Secure all the connections with wire nuts on each

electrical connector.

• Push the wires into the junction box and replace

the cover. Be sure the wires are not pinched.

• Secure the junction box cover with the 6 original

screws.

STEP 10 INSTALL DUCT COVER SUPPORTS

• Attach the duct cover supports to the sides of the

horizontal and ceiling supports using 4 screws per

duct cover support.

Junction

box cover

Knockout

Screws

Ceiling

support

Horizontal

support

Duct cover

support

Advertising