Assembly instructions – Yetter 2984 Series Generation II Maverick Opener User Manual
Page 18
Advertising
18
ASSEMBLY INSTRUCTIONS
2984-004 – DEPTH CONTROL KIT
STEP 5. Tighten all ½” hardware to 80 ft. lbs. of torque. The adjustment pin must work in all the settings
(holes). The skid shoes should be even front to back with each other. Adjust (slide) the poly skid side to
side to make contact with the coulter blade. Tighten the 3/8” hardware to 40 ft. lbs. of torque.
Advertising