Assembly instructions – Yetter 2984 Series Generation II Maverick Opener User Manual

Page 18

Advertising
background image

18

ASSEMBLY INSTRUCTIONS

2984-004 – DEPTH CONTROL KIT





STEP 5.
Tighten all ½” hardware to 80 ft. lbs. of torque. The adjustment pin must work in all the settings
(holes). The skid shoes should be even front to back with each other. Adjust (slide) the poly skid side to
side to make contact with the coulter blade. Tighten the 3/8” hardware to 40 ft. lbs. of torque.



Advertising