GReddy TURBO KITS: Toyota Celica GTS 2000-02 / MP62 User Manual

Page 13

Advertising
background image

Harness Grommet

Ground

A

B

3-13 Kit e-manage Ultimate installation

(1) Remove the ECM box cover and disconnect and

remove connector A, B, and ground from the box.

Remove the electrical tape to all the harness

grommet to move freely. The ECM is on the right side

of the engine bay.

(2) Locate the A/C line going through the right side of

the firewall. Cut the grommet in the center to allow

the wire harness to pass through the firewall.

(3) Route the wire harness through the firewall.

〈Part №23〉

e-manage harness

(4) Route the e-manage harness through the ECM

harness grommet from the smaller end of the

grommet.

(5) Refer to the wire diagram to connect e-manage wires

to the ECM wire harness.

Wrap with heat shrink tube and electrical tape

Wrap wires and

solder together

Remove cover

After connections are completed, place all of the

wire connectors back in the ECM box and place the

harness grommet back to its original location.

※ Place the connectors A and B in the ECM box before

connectors C and D.

The kit does include connectors for electrical wiring, but it is highly recommended to solder

all wire connections to ensure proper function. Also please confirm that all wires are

wrapped with electrical tape.

―13―

Advertising