Electrical installation, Typical ups wiring principle, Power wiring overview – American Power Conversion Symmetra MW User Manual

Page 11

Advertising
background image

Symmetra MW 1000 kW 480 V Installation - 990-4112E

7

Electrical Installation

Typical UPS Wiring Principle

Power wiring overview

See also

See separate guide on parallel operation for wiring overview in parallel systems.

1.

2.

3.

4.
5.
6.

7.

8.

SOURCE AND AC CABLING MUST BE 480 VOLT, WYE CONNECTED, 3 PHASE,

3 WIRE + GROUND (CONTACT APC IF OTHER).

DASHED LINES BETWEEN UNITS ( — — — ) REPRESENT AC/DC CABLING PROVIDED BY OTHERS.

ALL AC CIRCUIT BREAKERS ARE 100% CONTINUOUS DUTY RATED

WITH 24 VOLT DC SHUNT TRIPS AND 2A/2B AUXILIARY CONTACTS.

OPTIONAL COMPONENTS

SEPARATE CONDUITS. TWO WIRE + GROUND

UPS INPUT AND OUTPUT CONDUCTORS MUST BE IN SEPARATE AMPERE RATINGS.

UPS AND STATIC BYPASS WITHSTAND 200,000 SYMMETRICAL AMPERES.

INSTALLATION MUST COMPLY WITH ALL APPLICABLE NATIONAL AND LOCAL CODES.

Battery

Breakers

UPS

SSW

AC Mains
Input Lugs

Battery 1

480 V, 3PH, 3W & GND

480 V, 3PH, 3W & GND

Battery 2

External

Battery

Output Load Lugs

Q7

Q8

Q2

Q3

Q4

Q6

Q1

Q5

2

2

2

2

2

4

4

4

4

2

2

5

7

7

KK

LBB

KK

KK

Advertising