Electrical Installation: Top Cable Entry

12

Symmetra MW 1000 kW 480 V Installation - 990-4112E

Ground and AC cable connections (top cable entry)

Feed the AC and ground cables through the top of Input/Output Section as illustrated.

Connect the cables as illustrated.

2.3 in / 58 mm

1.75 in /
44.45 mm

1.75 in /
44.45 mm

Midpoint bonding jumper

Grounding electrode
conductors (red) for
Battery 1 & AC IN

Equipment grounding
cables for Battery 2
and AC Out

Output circuit
grounding bar