Top cable entry, Preparing for top cable entry (default) – American Power Conversion Symmetra MW User Manual

Page 13

Advertising
background image

Symmetra MW 1000 kW 480 V Installation - 990-4112E

9

Top Cable Entry

Preparing for top cable entry (default)

Cable entry in top cover of Input/Output Section.

Loosen the 8 bolts in cable entry covers. Drill holes for conduits in areas shown. Re-fit the
covers and install the conduits.

Install cable lugs on busbars. Use M12 bolts.

L2 IN

L1 IN

L3 IN

L1 OUT

L2 OUT

L3 OUT

AC IN

AC OUT

BAT 1

BAT 2

92

93

95

90

91

94

L3 OUT

L2 OUT

92

93

90

91

94

95

L1 OUT

L3 IN

L2 IN

L1 IN

2.3 in / 58 mm

1.75 in /
44.45 mm

1.75 in /
44.45 mm

IN/OUT power cable (top entry)

AC IN cable
entry

AC OUT
cable entry

Battery
cable
entry

Battery
cable
entry

Top view

M6 Bolt

Top view

Advertising