2 fixing the base to the support, 3 connection of the connector board, 1 connection of the power supply line – Videotec ULISSE MAXI NETCAM User Manual

Page 21

Advertising
background image

Instruc

tions manual - English - EN

19

7.2.2 Fixing the base to the support

Use the screws and the washers supplied
with the base.

After having positioned gasket (01), fasten base (02)
on support (03) using screws (04), toothed spring
washers (05) and the rings for screw (06).

01

02

03

06

05

04

Fig. 27

01

02

03

06

05

04

Fig. 28

Align the 3 notches on the base with those on the
support as shown in the following figure.

Fig. 29

Apply a thread-locker on the holes of the
screws (Loctite 243®).

Pay attention to the fixing. Tightening
torque: 4Nm.

7.2.3 Connection of the connector
board

The following is a description of the connector board
located inside the P&T base.

CN4

CN7

CN1

Ethernet

Fig. 30

7.2.3.1 Connection of the power supply line

The device is available in versions for different power
supply voltages: the value for the particular device
is shown on its identification label (4.2 Product
markings
, page 10).

Electrical connections must be performed
with the power supply disconnected and
the circuit-breaker open.

The electrical system to which the unit
is connected must be equipped with
a 20A max. bipolar protection switch.
The minimum distance between the
contacts must be 3mm (0.1in). The circuit
breaker must be provided with protection
against the fault current towards the
ground (differential) and the overcurrent
(magnetothermal).

Advertising