5 fixing the top unit, 1 counterweights installation – Videotec ULISSE MAXI NETCAM User Manual

Page 25

Advertising
background image

Instruc

tions manual - English - EN

23

7.2.5 Fixing the top unit

Inside the bottom cover there is a sachet
containing desiccant that is used to prevent
moisture formation in the base and near
the connector boards. Remove the sachet
during installation.

Attach the top unit (01) to the base (02) using
the attachment screws (03), supplied with the
corresponding seals (04). Make sure the base seal is
present and in good condition (05).

Pay attention to the fixing. Tightening
torque: 4Nm.

01

02

03

04

05

Fig. 38

There is only one way to anchor the base
with the top part. Align the tabs on the
sides to make sure the parts are positioned
correctly.

Fig. 39

7.2.1 Counterweights installation

Fully fasten the counterweights to the
casing by means of the M5 screws and
washers supplied as standard.

Fig. 40

Apply a thread-locker on the holes of the
screws (Loctite 243®).

Pay attention to the fixing. Tightening
torque: 4Nm.

Advertising