How to install new battery; fig. 16, Adjust supply stop; fig. 17 – American Standard SELECTRONIC 6068.26X User Manual

Page 11

Advertising
background image

3

5

7

6

T O P

1. Remove FRONT PANEL. For removing front panel

see Step 9 for instructions.

2. Remove the four COVER SCREWS (1) and COVER

(2) from ELECTRICAL BOX (3). Fig. 16.

3. Disconnect GREY SENSOR WIRE (4) from CIRCUIT

BOARD

(5).

4. Remove CIRCUIT BOARD (5) from ELECTRICAL

BOX

(3). Fig. 16a.

5. With your thumbs, spread the two TABS (6) on

battery holder apart and remove the BATTERY

(7).

2. Install NEW BATTERY (7) into holder on DC circuit
board. Press BATTERY

(7) down (contacts facing

downward) into position until TABS

(6) lock BATTERY (7)

into place.

6. Install CUIRCUIT BOARD (5) and connect GREY

SENSOR WIRE

(4).

7. Install COVER (2) and SCREWS (1).

8. Replace and FRONT PANEL. See Step 9 for

instructions on installing front panel.

10

HOW TO INSTALL NEW BATTERY;
Fig. 16

13

14

Fig. 16

Fig. 16a

Fig. 17

1

4

2

3

5

T O P

CLOCKWISE CLOSES

CONTROL STOP

COUNTER-CLOCKWISE

OPENS CONTROL STOP

IMPORTANT: To avoid overflowing, the SUPPLY STOP

(2) must never be opened to the point where the flow

from the valve exceeds the flow capacity of the

fixture. The fixture must be able to handle a

continuous flow in case of a flush valve failure.

Valve is designed to provide stated flush volume with

a 25 GPM flow rate.

1. After installation is complete, peel off the PROTECTIVE

FILM

(1) from the sensor. Standing to one side, block the

sensor with your hand for 10 seconds.

Remove your hand

and listen for audible “click” from within the valve.

2. Turn on SUPPLY STOP (2) 1/4 turn to 1/2 turn(CCW)

and test for leaks.

Note: Unit may flush for

approximately 5 to 10 sec. when water is first turned

on. If flow persists, turn water off and repeat step #1

above.

3. Actuate the FLUSH VALVE:

A) Cover sensor with hand for 10 seconds.

NOTE: Stand outside of sensor detection aera.

B) Remove hand from in front of the sensor; unit will

flush in approximately 3 seconds.

4. Adjust SUPPLY STOP (2) after each flush until the

stated flush volume is achieved, no splashing occurs and

the fixture is properly cleansed.

ADJUST SUPPLY STOP; Fig. 17

1

2

M968550 REV. 1.6

Advertising