American Standard SELECTRONIC 6068.26X User Manual

Page 5

Advertising
background image

4

Fig. 6

Fig. 6a

Fig. 6b

Fig. 6c

3

4 INSTALL VACUUM BREAKER AND
FLUSH CONNECTIONS; Fig. 6

4

1. Place the SPUD FLANGE (1) over the spud on the

Fixture.

Fig. 6.

2. Thread SPUD COUPLING NUT (2) onto Spud. Make

sure SEAL WASHER

(4) and FRICTION WASHER (3)

are installed. Do not tighten fully.

Fig. 6.

3. Remove the COUPLING NUTS (6, 6a) from the

CHROME ELBOW

(5). Make sure you have a TAPERED

RUBBER WASHER

(7), PLASTIC SUPPORT (8) and

SQUARE SEAL WASHER

(9). Fig. 6a.

4. Install the SQUARE SEAL WASHER (9) onto the

PLASTIC SUPPORT

(8) if not already installed. Insert

the PLASTIC SUPPORT

(8) into the DOWN TUBE (10).

Slide the COUPLING NUT

(6) onto the DOWN TUBE

(10). Connect the COUPLING NUT (6) to the

CHROME ELBOW

(5) and tighten fully. Insert the

DOWN TUBE

(10) with CHROME ELBOW (5) into the

SPUD COUPLING NUT

(2) and push it down. Do not

tighten fully.

Fig. 6a. Note: If center line of ELBOW

(5) cannot be adjusted to line up with hole in wall,

then cut the DOWN TUBE (10) as required.

5. Measure and cut the HORIZONTAL TUBE (11) to

length required.

Important: Make sure that there is a

minimum of 1-1/4" for engagement with elbow when

making your measurement. Fig. 6b.

6. Remove the COUPLING NUT (14) from BRASS

ELBOW

(12) and slide it onto the HORIZONTAL

TUBE

(11). Install the SQUARE SEAL WASHER (13)

onto the PLASTIC SUPPORT

(15) if not already

installed. Insert the PLASTIC SUPPORT

(15) into the

HORIZONTAL TUBE

(11). Connect the COUPLING

NUT

(14) to the BRASS ELBOW (12) and tighten fully.

Fig. 6b.

7. From behind the wall install the ELBOW AND TUBE

ASSEMBLY

(12, 11) through the hole in the wall. Install

WALL ESCUTCHEON

(16) onto HORIZONTAL TUBE (11).

Assemble the COUPLING NUT

(6a) and TAPERED

RUBBER WASHER

(7) in the CHROME ELBOW (5) onto

the HORIZONTAL TUBE

(11). Push the HORIZONTAL

TUBE

(11) into the CHROME ELBOW (5). Tighten

COUPLING NUT

(6a) but not fully. Fig. 6b.

8. For back spud installations: Follow steps #1 and #2

to install the spud coupling kit. Push the HORIZONTAL

TUBE

(11) into the spud connection on the back of the

fixture. Do not tighten fully. If spud coupling kit is not

required install HORIZONTAL TUBE

(11) into back

spud on fixture and hand tighten.

Fig. 6b.

9. All installations: If required cut scored VACUUM

BREAKER PIPE

(17) to fit, leave a minimum of 1-1/4"

(32mm) of pipe to ensure engagement with

compression coupling. Assemble the COUPLING NUT

(18) and TAPERED RUBBER WASHER (19) in the

BRASS ELBOW

(12) onto the VACUUM BREAKER

PIPE

(17). Install VACUUM BREAKER PIPE (17) into

BRASS ELBOW

(12) and hand tighten COUPLING

NUT

(18). Fig. 6c.

Note: If cutting VACUUM BREAKER PIPE (16) to

size, note that Critical Line (C/L) on Vacuum

Breaker must typically be 6" (152mm) above fixture.

Consult Code for details.

1

2

3

4

1-1/2" TOP SPUD

9

14

16

12

11

15

5

7

6a

13

6a

8

7

5

6

10

FLANGE END UP

FLANGE END

11

18

19

19

17

TOP SPUD

INSTALLATION

BACK SPUD

INSTALLATION

BACK SPUD

INSTALLATION

TOP SPUD

INSTALLATION

2

M968550 REV. 1.6

TAPERED SIDE

TAPERED

SIDE

12

TAPERED SIDE UP

TAPERED

SIDE UP

Advertising