In figure 102 – Allied Telesis AT-SBx31CFC960 User Manual
Page 163
Advertising

SwitchBlade x3112 Chassis Switch and AT-SBx31CFC960 Card Installation Guide
163
Figure 102. Handle on the XFP Transceiver
4. Slide it into the slot until it clicks into place, as shown in Figure 103.
Figure 103. Installing an XFP Transceiver in the AT-SBx31XZ4 Line Card
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining XFP transceivers.
5. Remove the protective cover from the fiber optic port on the XFP
transceiver, as shown in Figure 104 on page 164.
Handle
Advertising
This manual is related to the following products: