Allied Telesis AT-SBx31CFC960 User Manual
Page 165
Advertising

SwitchBlade x3112 Chassis Switch and AT-SBx31CFC960 Card Installation Guide
165
Figure 105. Attaching a Fiber Optic Cable to an XFP Transceiver in the
AT-SBx31XZ4 Line Card
7. Repeat this procedure to install additional XFP transceivers.
After installing and cabling the XFP transceivers in the AT-SBx31XZ4 Line
Cards, do one of the following:
To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 9,
“Powering On the Chassis” on page 173.
Advertising
This manual is related to the following products: