Unpacking the switch, Remove all components from the shipping package – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual

Page 52

Advertising
background image

Chapter 2: Installing the Switch

52

Unpacking the Switch

To unpack the switch, perform the following procedure:

1. Remove all components from the shipping package.

Note

Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.

2. Place the switch on a level, secure surface.

3. Make sure the following components are included in your switch

package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.

ˆ

One AT-9400 Gigabit Ethernet Switch

ˆ

Two rack-mount brackets

ˆ

Eight flathead Phillips rack-mount bracket screws

ˆ

AC power cord (AC switches only; Americas, EU, Australia, and
UK only)

ˆ

AC power cord retaining clip (AC switches only)

ˆ

Management cable for local management

ˆ

Documentation CD

ˆ

Warranty card

Advertising