KEMP Cisco B-Series User Manual

Page 21

Advertising
background image

Copyright © 2002 - 2014 KEMP Technologies, Inc. All Rights Reserved. Page 21 / 27

LoadMaster for UCS Installation
Guide for LoadMaster for UCS
Installation

Installation Guide

Figure 3-9 Temporary license warning

Click the OK button

12. You should now connect to the Appliance Vitals screen of the LoadMaster.

Figure 3-10 Appliance Vitals screen

13. Click the System Configuration menu option.
14. Click the eth0 menu option within the Interfaces section.

Figure 3-11 Network Interface screen

15. In the Network Interface 0 screen, enter the IP address of the eth0 interface, the

network facing interface of the LoadMaster, in the Interface Address input field.

16. Click the Set Address button
17. Click the eth1 menu option within the Interfaces section
18. In the Network Interface 1 screen, enter the IP address of the eth1 interface, the farm-

side interface of the LoadMaster, in the Interface Address input field.

19. Click on the Set Address button

This interface is optional, depending on the network configuration.

Advertising