Install the baseplate using jackscrews – Goulds Pumps 3296 EZMAG - IOM User Manual
Page 19
Installation
• Baseplate-leveling worksheet
This procedure is applicable to cast iron and fabricated steel baseplates.
1. Remove water and debris from the anchor bolt holes and sleeves.
2. If you use sleeve-type bolts, fill the bolt sleeves with packing material or rags to prevent
grout from entering the bolt holes.
3. Put the sets of wedges or shims on each side of each foundation bolt.
Make sure that the wedges extend 0.75 in. (19 mm) to 1.5 in. (38 mm) above the foundation
to provide adequate space for grouting. The wedges will provide adequate support for the
baseplate after it is grouted.
1. Shims or wedges
Figure 3: Top view
1. Shims or wedges
Figure 4: Side view
4. Lower the baseplate carefully onto the foundation bolts.
5. Put the machinist's levels across the mounting pads of the driver and the mounting pads of
the pump.
NOTICE:
Remove all dirt from the mounting pads in order to make sure that you achieve the correct
leveling. Failure to do so can result in equipment damage or decreased performance.
6. Level the baseplate both lengthwise and across by adding or removing shims or moving the
wedges.
These are the leveling tolerances:
• A maximum difference of 0.125 in. (3.2 mm) lengthwise
• A maximum difference of 0.059 in. (1.5 mm) across
You can use the baseplate-leveling worksheet when you take the readings.
7. Hand-tighten the nuts for the foundation.
Install the baseplate using jackscrews
Tools required:
• Anti-seize compound
• Jackscrews
• Bar stock
Model 3296 EZMAG Installation, Operation, and Maintenance Manual
17