Vision ii pro, Manual – American Aimers VIIPRO Image Processor Headlight Aimer User Manual
Page 27
 
Vision II Pro
TM
Manual
Page 27 of 28
6.2 EQUIPMENT MAINTENANCE
The Vision II Pro
TM
Image Processing Headlamp Aimer has been designed to provide a lifetime
of care free performance. Maintenance is limited to occasional lubrication of the base wheels 
with light machine oil such as SAE 10w or similar. The aimer housing lens should periodically be 
cleaned with an anti-static video screen cleaner, taking care not to allow any abrasive 
substance to come in contact with the lens. 
DO NOT ALLOW ANY SOLVENTS TO COME IN CONTACT WITH THE AIMER LENS.
DO NOT ALLOW ANY CONTACT BY WATER OR OTHER LIQUIDS TO THE AIMER OR 
MONITOR HOUSING. 
THERE ARE NO USER SERVICEABLE COMPONENTS WITHIN THE AIMER HOUSING OR
MONITOR ASSEMBLY. REFER ANY NEEDED REPAIRS OF THESE COMPONENTS TO 
QUALIFIED FACTORY SERVICE PERSONNEL ONLY. 
 
 
6.3 EQUIPMENT OPTICAL CALIBRATION 
The Vision II Pro
TM
Aimer’s main PC Board and Camera have been calibrated at the factory and
require no further calibration on-site. The unit is designed so that once the factory calibration 
has been performed the unit cannot become "un-calibrated" unless the unit has sustained 
physical damage. The calibration is checked as part of the power-up self test to assure no 
problems are evident. If upon checking the calibration, the unit finds a malfunction, it will display 
"CALIBRATION CHECK FAILURE." If this happens, contact an American Aimers Customer 
Service Representative at 1-877-343-7703 for corrective action.