8 initialization, Cs4354 – Cirrus Logic CS4354 User Manual

Page 16

Advertising
background image

16

DS895F2

CS4354

When power is first applied, the POR circuit monitors the VA supply voltage to determine when it reaches
a defined threshold, V

on1

. At this time, the POR circuit asserts the internal reset low, resetting all of the

digital circuitry. Once the VA supply reaches the secondary threshold, V

on2

, the POR circuit releases the

internal reset.

When power is removed and the VA voltage reaches a defined threshold, V

off

, the POR circuit asserts the

internal reset low, resetting all of the digital circuitry.

Note:

For correct operation of the internal POR circuit, the voltage on VL must rise before or simulta-
neously with VA.

4.8

Initialization

When power is first applied, the DAC enters a reset (low power) state at the beginning of the initialization
sequence. In this state, the AOUTx pins are weakly pulled to ground and FILT+ is connected to GND.

The device will remain in the reset state until V

ON2

is reached. Once V

ON2

is reached, the internal digital

circuitry is reset and the DAC enters a power-down state until MCLK is applied.

Once MCLK is valid, the device enters an initialization state in which the charge pump powers up and charg-
es the capacitors for the negative voltage supply.

Once LRCK is valid, the number of MCLK cycles is counted relative to the LRCK period to determine the
MCLK/LRCK frequency ratio. Next, the device enters the power-up state in which the interpolation filters
and delta-sigma modulators are turned on, the internal voltage reference, FILT+, powers up to normal op-
eration, the analog output pull-down resistors are removed, and power is applied to the output amplifiers.

If a valid SCLK is applied, the device will clock in data according to the applied SCLK. If no SCLK is present,
the device will clock in data using the derived internal SCLK (see

Figure 3 on page 9

) and will apply the de-

emphasis filter according to

Section 4.4.2.1 on page 14

.

After this power-up state sequence is complete, normal operation begins and analog output is generated.

If valid MCLK, LRCK, and SCLK are applied to the DAC before V

ON2

is reached, the total time from V

ON2

to the analog audio output from AOUTx is less than 50 ms.

See

Figure 9

for a diagram of the device’s states and transition conditions.

Advertising