Bryant DURAPAC 579F User Manual

Page 21

Advertising
background image

21

XIV. STEP 14 — INSTALL HUMIDISTAT FOR OPTIONAL
PERFECT HUMIDITY™ DEHUMIDIFICATION PACKAGE

Perfect Humidity dehumidification package operation can be
controlled by field installation of a Bryant-approved
humidistat. To install the humidistat perform the following
procedure:

1. Locate humidistat on a solid interior wall in the con-

ditioned space. Location should be a well ventilated
area to sense average humidity.

2. Route thermostat cable or equivalent single leads of

colored wire from humidistat terminals through con-
duit in unit to the low voltage connection on the
2-pole terminal strip (TB3) as shown in Fig. 33 and
Fig. 34. See Fig. 35 for operational diagram.

Fig. 34 — Typical Perfect Humidity™

Dehumidification Package Control Box

Fig. 33 — Typical Wiring Perfect Humidity Dehumidification Package Humidistat (460 V Unit Shown)

LEGEND

CB

Circuit Breaker

LLSV — Liquid Line Solenoid Valve
LPS

Low-Pressure Switch

TB

Terminal Block

TRAN — Transformer

Advertising