Bryant 350MAV User Manual

Page 8

Advertising
background image

d. Use inducer housing drain tube (violet label and factory-

supplied in loose parts bag) to connect LOWER inducer
housing drain connection to the condensate trap.

e. Connect inducer housing drain connection to condensate

trap.

(1.) Condensate Trap Located on Left Side of Casing

(a.) Determine appropriate length and cut.

(b.) Connect tube to condensate trap.

(c.) Clamp tube to prevent any condensate leakage.

(2.) Condensate Trap Located on Right Side of Casing

(a.) Route inducer housing drain tube (violet label)

directly from inducer housing to condensate
trap as shown in Fig. 8.

(b.) Determine appropriate length and cut.

(c.) Connect tube to condensate trap.

(d.) Clamp tube to prevent any condensate leakage.

3. Relief Port Tube

Refer to Pressure Switch Tubing section for connection
procedure.

C.

Condensate Trap Field Drain Attachment

Refer to Condensate Drain section for recommendations and
procedures.

D.

Pressure Switch Tubing

One collector box pressure tube (pink label) is factory connected to
the pressure switch for use when furnace is installed in UPFLOW
applications. This tube MUST be disconnected and used for the
condensate trap relief port tube. The other collector box pressure
tube (green label) which was factory connected to the condensate
trap relief port connection MUST be connected to the pressure
switch in DOWNFLOW or HORIZONTAL RIGHT applications.

NOTE:

See Fig. 7 or 8 or tube routing label on main furnace door

to check for proper connections.

Relocate tubes as described below.

1. Disconnect collector box pressure tube (pink label) attached

to pressure switch.

2. Extend collector box pressure tube (green label) which was

previously connected to condensate trap relief port connec-
tion by splicing to small diameter tube (factory-supplied in
loose parts bag).

3. Connect collector box pressure tube (green label) to pres-

sure switch connection labeled COLLECTOR BOX.

4. Extend collector box pressure tube (pink label) which was

previously connected to pressure switch by splicing to
remaining small diameter tube (factory-supplied in loose
parts bag).

5. Route this extended tube (pink label) to condensate trap

relief port connection.

6. Determine appropriate length, cut, and connect tube.

7. Clamp tube to relief port connection.

E.

Condensate Trap Freeze Protection

Refer to Condensate Drain Protection section for recommenda-
tions and procedures.

IV.

HORIZONTAL LEFT (SUPPLY-AIR DISCHARGE)

APPLICATIONS

A horizontal left furnace application is where furnace blower is
located to the right of combustion and controls section of furnace,
and conditioned air is discharged to the left.

Fig. 9—Horizontal Left Tube Configuration

A96198

CONDENSATE

TRAP

AUXILIARY

"

J

"

BOX

RELOCATED HERE

PLUG

CAP

INDUCER HOUSING
DRAIN TUBE (VIOLET)

COLLECTOR BOX
DRAIN TUBE (BLUE)

COLLECTOR BOX TUBE (PINK)

COLLECTOR BOX

EXTENSION TUBE

COLLECTOR BOX
DRAIN TUBE
(BLUE AND WHITE STRIPED)

COLLECTOR BOX EXTENSION TUBE

DRAIN TUBE COUPLING

COLLECTOR BOX
TUBE (GREEN)

COLLECTOR

BOX EXTENSION

DRAIN TUBE

—8—

Advertising