Figure 8: tail shaft assembly, Inspection, Reassembly and installation – Hale 4DK Series User Manual

Page 24: Inspection reassembly and installation

Advertising
background image

24

Manual p/n: 029-0020-79-0

4DK Series Pumps

9. Remove the bearing cone from the bearing

carrier. Gently tap out the bearing cups
and remove the bearing spacers.

10. Using retaining ring pliers, remove the

retaining ring from the bearing carrier.

11. Remove the O-ring seal from the bearing

carrier.

Inspection

1. Clean bearings and other components

using parts cleaner.

2. Carefully inspect bearings and seals for

signs of excessive wear. The bearings,
shims, and spacers are a matched set and
must be replaced as a unit. Order using
Hale p/n: 250-8140-50-0.

3. Obtain new components from Hale Prod-

ucts as appropriate.

Reassembly and Installation

See Figure 8: "Tail Shaft Assembly."

1. Using retaining ring pliers, install retaining

ring into bearing carrier.

2. Insert, on top of the retaining ring, the outer

bearing spacer, then press in the bearing
cup.

Be careful not to mix bearing components
with those from other bearing sets. Should
the outer spacer be confused with that
from the bearing carrier, the one used for
the tail shaft assembly is noticeably thinner
than the bearing carrier spacer.

3. To the tail shaft, press on the roller bearing

inner race (see Figure 8 above).

4. Slide the matching inner bearing cone and

spacer onto the tail shaft. Both are a tight
fit.

Figure 8: Tail Shaft Assembly

O-Ring

Retaining Ring

Bearing Cone

Roller Bearing

Inner Race

Tail Shaft

Bearing Cup

Shims

and Spacer

Bearing Cup

Washer

Screw

1/2-13 x 1-3/4"

Yoke

Bearing Carrier

Oil Seal

Advertising