Assembly sequence for bullbar – ARB 3413050 User Manual

Page 11

Advertising
background image

03/12/04 Page 11 of 11 3782893

ASSEMBLY SEQUENCE FOR BULLBAR.

22.

(If fitting with winch)

1. Assemble the control box bracket to the control box

using M6 nuts located on the control box bolts.

2. Mount the control box to the bar using M6 X 16

bolts and M6 flange nuts. Fasten the control box to
the front of the cutout on the top pan. This should
leave an opening at the rear for viewing the cable
drum while operating the winch.

Note: If fitting a 10000lb or 12000lb winch cable kit
6171397 is required. Replace the control box cables with
the new longer cables.

23.

1. Fasten the buffers using the M6 flange nuts
supplied.

24.

(If fitting with winch)

Connect the winch control box cables to the winch motor. Refer to the Warn handbook for additional
information. Connect the long winch + & - cables to the vehicle after the bar is installed.
Refer to the Warn
winch manual for vehicle wiring instructions. Note: if fitting a 10000lb or 12000lb winch cable kit 6171397 is
required. Use the longer leads to replace ones on control box.

Ensure that these cables are installed well clear of sharp, hot or moving objects. Secure the winch cables
to the vehicle and winch bumper with the supplied cable ties.

25.

Wire the turn signal lights to the vehicle wiring.

Advertising