Installing the shell plate, Loading the primer tube, Primer filler tube – Hornady Lock-N-Load Ammo Plant User Manual

Page 35: Primer feed tube, Primer tube support primer tube housing

Advertising
background image

2 – Flat Washer
3 – Shell Plate

5 – Drive Hub
6 – Sub Plate

EZject

4 – Retainer Spring Groove

1 – Shell Plate

Retainer Bolt

Primer Filler Tube

(Large or Small)

Primer Filler Tube

(Large or Small)

Primer Feed Tube

(Large or Small)

Primer Tube Support

Primer Tube Housing

Primer Filler Tube

(Large or Small)

Primer Filler Tube

(Large or Small)

Primer Feed Tube

(Large or Small)

Primer Tube Support

Primer Tube Housing

Installing the Shell Plate

• Put a small amount of general-purpose grease on the

Shell Plate Ball Detents located on bottom side of Shell
Plate (3), and on the top surface of the Sub-Plate (6).

• Align the Shell Plate (3) with the keyed Drive Hub (5).
• Place the 3/8" Shell Plate Retainer Bolt (1) through

the 3/8" Flat Washer (2), (large end up) and thread the
bolt into the Drive Hub (5).

• Tighten the bolt (1) using a 5/16" Allen wrench, only

tight enough to prevent it from coming loose.

• Stretch the Case Retainer Spring

over the top of the

Shell Plate (3).

• While cycling the Press, push the Case Retainer Spring

into the relieved area on the Sub-Plate (6). You will
have to cycle the press a couple of stations to receive
these results.

Loading the Primer Tube

Carefully transfer the primers out of their factory package
into a Hornady Primer Turning Plate and orientate them
“shiny side up.” Then holding the Primer Filler Tube (large
of small) like a pencil bring the plastic primer pick up tip
over each primer and gently press it over the primers. The
primers will be pushed into the filler tube one on top of
another. Continue loading the primer filler tube until you
have picked up approximately 100 primers.

Make sure the cotter pin is in place; turn the Primer
Filler Tube upside down. At the top of the exposed Primer
Filler Tube, there may be several primers still held and
visible. Gently shake the tube to release the primers.

Align the Primer Filler Tube (large of small) to the Primer
Feed Tube (large of small) using the Primer Tube Support.
Remove the cotter pin from the Primer Filler Tube (large of
small) and fill the Primer Feed Tube (large of small). The
capacity of the primer tube is 100 primers.
Do not over fill the primer tube.

Insert the Primer Follower into the Primer Tube (large of
small). This will help the primers feed more reliably.

- 35 -

OPERATION: AP PRESS

OPERA

TION

Advertising