Transfer Carriage

11-20

944E-42

7. If you are replacing the pin, remove the bottom snap

ring (7).

8. Shut the engine OFF.

9. Place a Do Not Operate Tag on both the ignition key

switch and the steering wheel, stating that the
machine should not be operated.

10. Open the engine cover. Allow the system fluids to

cool.

11. Properly disconnect the batteries.

12. Secure the transfer cylinder with a sling and take up

any slack.

13. Label, disconnect and cap all hydraulic hoses (8)

attached to the transfer cylinder. Cap all fittings and
openings to keep dirt and debris from entering the
hydraulic system.

14. Remove two bolts (9) securing the transfer cylinder

to the machine.

15. Lift, lower and place the transfer cylinder on support

blocks on a firm level surface.

b. Transfer Cylinder Installation

1. Lift the transfer cylinder into position on the vehicle

chassis.

2. Replace two bolts securing the transfer cylinder to

the frame.

3. Uncap and reconnect the previously labeled

hydraulic hoses to the transfer cylinder.

4. Move the transfer carriage 5 ft 8 in (172 cm) so that

the pin (1) connecting the transfer cylinder to the
transfer carriage is at a pin access hole (2) near the
rear of the cab.

Note: Make sure the threaded hole, of the transfer
cylinder pin, is facing downward during installation.

5. Connect the transfer cylinder (3) to the transfer

carriage mount (4) with the transfer cylinder pin (5)
securing it with retaining rings (6).

6. Properly connect the batteries.

7. Close and secure the engine cover.

MU3371

8

9

MU3051

1

2

MU5491

5

6

4

3