SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-14

– JLG Lift –

3121627

4.

Check auxiliary power for proper operation. Operate each
function control switch to ensure proper operation of the
auxiliary power system.

NOTE:

Step 5 is only applicable for 800A ANSI market machines.

5.

If equipped with a dual capacity system, check the limit
switch as follows:

a. On a level surface with less than 500 lb (227 kg) in the

platform, raise tower base boom to maximum angle
keeping main boom horizontal.

b. Extend the main fly boom until the capacity indicator

lights change from 1000 lb. (454 kg) to 500 lb. (227 kg).

c. With main boom in this position, raise the main base

boom until the capacity indicator lights change back to
the 1000 lb. (454 kg) indicator.

DISCONTINUE OPERATION IF THE CAPACITY INDICATOR SYSTEM DOES NOT OPERATE
PROPERLY.

6.

Drive forward and reverse; check for proper operation.

7.

Steer left and right; check for proper operation.

8.

Check the high-drive cutout for the tower boom assembly as
follows:

a. Place machine on level surface with booms retracted

and lowered.

b. From the platform control, position Drive Speed/Torque

Select switch to Fast (Forward Position).

c. Using extreme caution, partially position the DRIVE

control to Forward just enough to cause the machine to
move.

d. Raise the Tower Boom until the drive speed shifts from

high speed to slow or creep speed. The bottom of the
upright should NOT be above the hood level of the
machine.