JLG 800A_AJ Operator Manual User Manual

Page 58

Advertising
background image

SECTION 3 - MACHINE CONTROLS AND INDICATORS

3-14

– JLG Lift –

3121627

10.

Main Boom Telescope

Provides extension and retraction of the main
boom.

11.

Lights (If Equipped)

This switch operates control console panel
lights and head lights if the machine is so
equipped. The ignition switch does not have to be on to
operate the lights, so care must be taken to avoid draining
the battery if left unattended. The master switch and / or the
ignition switch at the ground control will turn off power to
all lights.

12.

Jib (If Equipped)

Push forward to lift up, pull back to lift down.
Variable lift speed is using the Function Speed
Control.

13.

Soft Touch Override Switch (If equipped)

This switch enables the functions that
were cut out by the Soft Touch system to
operate again at creep speed, allowing the operator to move
the platform away from the obstacle that caused the shut-
down situation.

14.

Tower Telescope

This switch provides for extending and
retracting of the tower boom when posi-
tioned to in or out. Tower Telescope must
be fully retracted before operating Tower Lift. (Tower
Telescope should not function when Tower Lift is not
fully elevated “up”).

TO AVOID UPSET AND SERIOUS INJURY, DO NOT OPERATE MACHINE IF
TOWER LIFT AND TELESCOPE DO NOT OPERATE IN THE ORDER
DESCRIBED ABOVE.

15.

Tower Lift

This switch provides for raising and lowering of
the tower boom when positioned to “up” or
“down”. Tower Lift must be fully elevated “up”
before operating Tower Telescope. (Tower Lift should not
function when Tower Telescope is extended).

Advertising