Releveling valve -20 – JLG 800A_AJ Operator Manual User Manual
Page 84
Advertising
SECTION 4 - MACHINE OPERATION
4-20
– JLG Lift –
3121627
6.
Lower the tower boom fully and con-
tinue to hold down the switch to
Tower Down for an additional 20 sec-
onds.
7.
Repeat steps 3 thru 6 as necessary until the upright is 90°
(vertical) relative to the chassis.
Figure 4-7. Releveling Valve
Advertising