Section 4. boom & platform, 1 boom maintenance, Removal – JLG M450 ANSI Service Manual User Manual

Page 113: Disassembly, Section 4 - boom & platform, Boom maintenance -1, Removal -1 disassembly -1, Location of components - boom removal -1, 1 boom maintenance removal

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121127

– JLG Lift –

4-1

SECTION 4. BOOM & PLATFORM

4.1 BOOM MAINTENANCE

Removal

1. Remove the platform/support as follows:

a. Disconnect electrical cable from control con-

sole.

b. Using an overhead crane or suitable lifting

device, strap support the platform/support.

c. Remove hardware from pin #1. Using a suitable

brass drift and hammer, remove pin #1 from the
platform support.

d. Supporting the platform/support, remove the

hardware from pin #2. Using a suitable brass
drift and hammer, remove pin #2 from the fly
boom and remove the rotator.

e. Supporting the slave cylinder, remove the hard-

ware from pin #3. Using a suitable brass drift
and hammer, remove pin #3 from the fly boom.

f. Tag and disconnect hydraulic lines to the slave

leveling cylinder. Use a suitable container to
retain any residual hydraulic fluid. Cap hydraulic
lines and ports. Remove the slave cylinder.

2. Remove the boom from upright as follows:

a. Remove hardware securing the cover plate on

the side of the base boom section and remove
hose clamps. Disconnect wiring harness from
ground control harness connector.

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDI-
ATELY AFTER DISCONNECTING LINES TO AVOID ENTRY OF CON-
TAMINANTS INTO SYSTEM.

b. Tag and disconnect hydraulic lines from boom

to control valve. Use a suitable container to
retain any residual hydraulic fluid. Cap hydraulic
lines and ports.

c. Using a suitable lifting equipment, adequately

support boom weight along entire length.

d. Remove hardware securing the lift cylinder pin

#1. Using a suitable brass drift and hammer,
remove pin #1 from the base boom.

e. Remove hardware securing the master cylinder

pin #2. Using a suitable brass drift and hammer,
remove pin #2 from the base boom.

f. Remove hardware securing the base boom pin

#3. Using a suitable brass drift and hammer,
remove pin #3 from the upright.

g. Using all applicable safety precautions, carefully

lift boom assembly clear of upright and lower to
ground or suitable supported work surface.

Disassembly

1. Loosen jam nuts on aft end of fly boom wear pad

adjustment and loosen adjustments.

2. Using a portable power source, attach hose to tele-

scope cylinder port block. Using all applicable
safety precautions, activate hydraulic system and
extend cylinder to gain access to cylinder rod pin
#1. Shut down hydraulic system.

3. Carefully disconnect hydraulic hose from retract port

of cylinder. There will be initial weeping of hydraulic
fluid which can be caught in a suitable container.
After initial discharge, there should be no further
leakage from the retract port.

Figure 4-1. Location of Components - Boom Removal

Advertising
This manual is related to the following products: